Portcullis House
Alongside Big Ben sits the parliamentary office building Portcullis House which opened in 2001. It was designed by Michael Hopkins & Partners to represent the chained portcullis symbol of the Houses of Parliament, together with a series of 'mock' chimneys said to invoke the Gothic Revival of its neighbour.
When commissioned in 1992 the cost of Portcullis House was to be £165m. After building cost inflation and delays, the price increased to £235m, including an extra £10 million MP's had not been told about. Costs included £150,000 for decorative fig trees, £2m for electric blinds and, for each MP, a reclining chair at £440.[4] A parliamentary inquiry into the over-spend was carried by Sir Thomas Legg. Although completed in 2000, the report was never published.[5] By April 2012 the fig trees, which were rented, had cost almost £400,000.[6]
In 2015 the roof required repairs and this was expensive, the MP's considered suing the architects (Hopkins) and structural engineers (Arup) [1].
References:
- https://www.theguardian.com/politics/2002/jul/24/uk.houseofcommons1
- http://www.independent.co.uk/news/uk/politics/mps-may-sue-firm-that-built-portcullis-house-over-roof-damage-a6914491.html
- https://www.i-fm.net/members/news/feb01/27_01.html
- "Royal seal of approval: Portcullis House opens". The Guardian. 27 February 2001. ISSN 0261-3077. Retrieved 2016-08-11.
- Swaine, Jon (10 October 2009). "MPs expenses: Profile of Sir Thomas Legg". London: Telegraph. Retrieved 2009-10-13.
- "Taxpayer spends £400,000 on fig trees for MPs". Retrieved 2016-08-11.
See also:
Featured articles and news
HSE simplified advice for installers of stone worktops
After company fined for repeatedly failing to protect workers.
Co-located with 10th year of UK Construction Week.
How orchards can influence planning and development.
Time for knapping, no time for napping
Decorative split stone square patterns in facades.
A practical guide to the use of flint in design and architecture.
Designing for neurodiversity: driving change for the better
Accessible inclusive design translated into reality.
RIBA detailed response to Grenfell Inquiry Phase 2 report
Briefing notes following its initial 4 September response.
Approved Document B: Fire Safety from March
Current and future changes with historical documentation.
A New Year, a new look for BSRIA
As phase 1 of the BSRIA Living Laboratory is completed.
A must-attend event for the architecture industry.
Caroline Gumble to step down as CIOB CEO in 2025
After transformative tenure take on a leadership role within the engineering sector.
RIDDOR and the provisional statistics for 2023 / 2024
Work related deaths; over 50 percent from construction and 50 percent recorded as fall from height.
Solar PV company fined for health and safety failure
Work at height not properly planned and failure to take suitable steps to prevent a fall.
The term value when assessing the viability of developments
Consultation on the compulsory purchase process, compensation reforms and potential removal of hope value.
Trees are part of the history of how places have developed.